Two current reference projects of the Tyrolean insulation specialist Steinbacher have received the klimaaktiv bronze and gold standard respectively. A high distinction in terms of ecology and quality, achieved in part through efficient insulation materials in the roof and facade.
On Brucknerstraße in Innsbruck, a residential complex from the 1950s was renovated to passive house standard over two years, made completely barrier-free and extended upward in a modern style. 32 new rental apartments were added to the 50 existing apartments. A photovoltaic system on the roof provides inexpensive solar power. Almost 1,000 m³ of highly efficient gray steinopor® EPS plus insulation boards with infrared reflectors from Steinbacher, Austria’s only full-range insulation supplier, are in the facade and contribute to the outstanding energy balance, among other things.
Salzburg courthouse
The new courthouse in Salzburg also combines renovation and new construction in a particularly climate-friendly way: the listed part of the building was converted and renovated to the highest energy and ecological standards, and a modern extension connects the two wings of the building. The warm roof build-ups were executed in exemplary fashion by the flat roof specialists of Karl Mayr from Saalfelden. “Here we not only supplied approx. 1,100 m2 of steinopor® products with very good insulation performance, but were also able to contribute our expertise to the planning of the tapered insulation. The complicated roof shapes required a sophisticated solution with complex slope layouts. Another challenge was the many different surfaces with different materials and build-up heights, each of which had to be worked out separately,” says Steinbacher Managing Director Mag. Roland Hebbel, explaining the details of the project in the city of Mozart.



