Opportunities for timber construction – sound and fire under control with Steinbacher.

The current OIB guidelines open up opportunities for the versatile raw material wood. This is because not only the top two stories can be offered in timber construction, but up to 6 stories: in other words, more building classes, more apartments, larger areas and more design freedom. Anyone who values legally compliant sound and fire protection regulations is best advised to use system build-ups with Steinbacher products. These best demonstrate compliance with the requirements of the OIB guidelines through testing. 

The current fire protection regulations open up new possibilities for you:

What’s new in OIB Guideline 2 Fire Protection
(first edition 2007/ 2011/ 2015/ currently 2019)

Building classes:

  • GK 1: a maximum of two apartments (previously one)
  • GK 2: the restriction to five apartments has been removed
  • GK 5: (≤ 6 stories above ground) timber construction is not only permitted in the top two stories but generally permitted
  • in stories above ground, the provision for components in A2 no longer applies
  • for industrial buildings, fire compartments of up to 1,800 m² are possible in timber construction without classification, and in classification R 30 up to 3,000 m²
  • for industrial buildings, timber construction is possible up to 10,000 m² in combination with technical fire protection measures
  • you can find more information on fire protection in our catalog Above-Rafter Insulation 

 

Advantages of system build-ups from Steinbacher with steinothan® above-rafter insulation elements:

  • Tested and certified build-ups from REI 30 to REI 90
  • Building projects with exposed roof trusses possible from GK 1 to GK 5

Here you will find the tested and certified pitched roof system build-ups:

to the catalog

We offer you the following Steinbacher advantages:

  • up to 22 different tested and certified build-ups (tgm testing institute, Vienna)
  • System build-ups with a sound reduction index of 43 dB to 57 dB
  • for all roof coverings (bitumen, roof tiles, sheet metal, etc.)
  • for renovations with existing between-rafter insulation
  • you can find further information in our catalog Above-Rafter Insulation
Auszug Anforderung gem. OIB-Richtlinie 5 – Ausgabe März 2015/Pkt. 2.2.3. Die vollständige Tabelle finden Sie in unserem Katalog Aufdachdämmung oder unter http://www.oib.or.at/de/oib-richtlinien.

Conclusion

With the steinothan® above-rafter insulation elements from Steinbacher in combination with our system build-ups, almost any building project can be solved in terms of fire protection, sound insulation and, of course, thermal insulation.

“pure life” certification

All steinothan® products carry the “pure life” environmental seal. This certificate is awarded by the Fraunhofer Institute for Wood Research and confirms the emission-tested quality of construction products. This means: only insulation products that meet the strictest requirements with regard to their ingredients and have verifiably been manufactured without plasticizers, halogenated blowing agents such as HFCs, flame retardants such as HBCD or TCEP, or raw materials harmful to health receive this environmental quality mark. In short: anyone who chooses low-emission insulation materials sustainably improves the quality of living in their own home.

You can find more information about the pure life seal here!

Pitched Roof FAQs

Below you will find the answers to the most frequently asked questions about sloping and pitched roofs. Our application engineering team will be happy to answer any further questions.

Contact:
+43 5352 700-0
technik@steinbacher.at

You can find all data sheets for the pitched roof products in the downloads.

to the downloads